BT Landline Switchover 2027: Act Early, Stay Connected

BT has extended its deadline for landline switchover to 2027, yet every copper line will still shut off in the end. When the BT landline switchover 2027 takes effect, calls will run over broadband Digital Voice, leaving alarms, card readers, or care lines mute if you wait. Backed by 100-plus five-star reviews, The VoIP Shop manages number porting, battery backup, and full setup on the first visit, meeting Ofcom rules.  Act today, and your phones will stay live long before January 2027 arrives.

Switch smart, not stressed - 20 million businesses will be making this change.

Get ahead of the crowd from just £9.95/m per user

Secure My Digital Line

Get a Free Quote and

Start Saving up to 60%

Contact Us

Trusted By 10,000+ UK Businesses

Pepes

Chaiiwala

Dalby

Dock

Lesta

London medical

Madani

Mountbatten School

Rochdale

Uk Parliment

Leicester City Council

NHS

Krispy Kreme

Move Your BT Line to The VoIP Shop in 6 Easy Steps

The BT landline switchover 2027 is coming fast, but shifting now keeps calls flowing and locks in our £9.95 / month / user plan. Follow this six-step guide:


  1. Check your broadband
    Make sure you have a stable fibre or FTTC link; good internet is the backbone of Digital Voice.
  2. Request a free quote
    Call 0116 350 0117 or fill in our web form. We confirm costs, features and cut-off dates in writing.
  3. Sign the Letter of Authority
    This lets us contact BT and start the port. Attach a copy of your latest bill showing the numbers you wish to keep.
  4. Pick your port date
    Choose a quiet trading day at least ten working days ahead. We book the slot before engineer diaries fill up.
  5. Install and test the kit
    Our team ships a pre-configured router, Digital Voice adapter and battery pack. Plug in, make a test call, and run a card transaction if you use a terminal.
  6. Confirm completion and cancel copper
    Once calls ring on your new service, we email confirmation. You can then cancel the old PSTN or ISDN line, beating the 2027 shutdown with zero downtime.

BT’s Copper Cut-Off Arrives 2027 — Switch Early, Keep Every Call

Move My Line Now

5 Risks of Waiting Until the Last Minute

Service blackout – Leave migration too late and your copper line may simply stop on switch-day, cutting phones, alarms, card readers and lift phones until an IP route is live.

Engineer backlog – Openreach and partner installers already warn of limited slots; a last-minute rush will create capacity bottlenecks and delay new kit for weeks.

Number loss or port errors – Porting thousands of lines at once raises the chance of mis-routes and missed windows, which can leave firms without inbound calls.

Weaker support terms – Providers say future contracts may carry reduced service-level agreements for late movers, meaning slower fault repair and higher downtime costs.

Rushed, ill-fitting solutions – Businesses that panic-buy in 2026 risk picking systems that fail to cover their real needs because there is no time left for testing and staff training.

Acting now avoids these pitfalls, locks in the right VoIP plan, and ensures a smooth transition before the BT landline switchover 2027 deadline.

Who Must Switch and When?

The new BT landline switchover 2027 timetable does not treat every customer the same. Deadlines depend on the service running over each copper pair, and some user groups need to act much sooner than others.

Homes With Only a Landline

Households that still plug an analogue phone straight into a wall socket will receive at least four weeks’ written notice before their local exchange moves to Digital Voice.


If no broadband exists at the address, BT will install a basic IP line free of charge, yet the change will still take place by 31 January 2027.


Ordering broadband early avoids last-minute engineer shortages and lets residents keep existing numbers without fuss.

Swtich Your Home Landline
Homes with only a landline
Businesses on ISDN or PSTN

Businesses on ISDN or PSTN

Companies using ISDN30, ISDN2 or plain PSTN trunks face a tighter window. BT Business “strongly advises” firms to migrate by December 2025 so sites can test fire panels, card readers and lift lines well ahead of the national shut-off.


Orders for new ISDN circuits stopped in 2023, and Openreach will withdraw remaining channels region-by-region through 2026 before the final stop date in 2027.


Early movers avoid congestion and gain IP features, while late entrants risk downtime and call-routing costs.

Swtich to VoIP Phone System

Telecare, Alarms, Payment Terminals

Roughly two million people rely on pendant alarms, payment terminals or lift phones that dial over copper. After faults were reported during initial roll-outs, BT paused forced migrations and now switches vulnerable lines only when:


a compatible digital device is fitted, a battery pack is provided, and the unit is live-tested by an engineer. A joint campaign launched in 2025 urges carers to register vulnerable users so these checks happen well before the 2027 cut-off. Businesses running chip-and-PIN or alarm panels on PSTN should budget for IP converters or mobile back-ups this year.

Swtich to VoIP Phone System
Telecare, Alarms, Payment Terminals

Copper Lines Are Ending Soon: Upgrade to VoIP Before It’s Too Late

Start My Digital Switch

Digital Voice vs Analogue Lines

Digital Voice sends speech as data over broadband, whereas an analogue line moves an electrical signal along copper wire. Handsets plug into a router, not a wall socket, so sound improves and extra tools come built-in. Because service depends on local power, a battery pack or mobile back-up is essential before the BT landline switchover 2027

Call Quality and Added Features

HD Calling widens speech frequencies, giving clearer voices when both ends use Digital Voice or an EE mobile. Users may hold two calls at once, run three-way chats, block nuisance numbers with Call Protect, and divert calls to mobiles without new hardware. None of these perks work on legacy PSTN or ISDN lines.

Call Quality and Added Features
Power-Cut Limitations and Battery Packs

Power-cut Limitations and Battery Packs

Analogue corded phones keep ringing during outages because the exchange powers them. Router-based Digital Voice stops if mains fails, so Ofcom now requires providers to supply a free battery unit or other solution for anyone relying on 999 access or telecare. BT engineers fit the pack during migration, and users should test it yearly while keeping a charged mobile handy. 

Don’t Risk Lost Calls in 2027 — Make the Move to Digital Voice Today

Secure My VoIP Line

Switchover Checklist for Small Businesses

A short plan helps a small business move well before the BT landline switchover 2027 and keeps the till ringing on change-over day.

Audit Every Device on Copper

Make a list of every handset, alarm, lift phone, fax or chip-and-PIN box that still feeds off the old network. Openreach will pull WLR and ISDN services by January 2027, so each item must gain an IP adaptor, a mobile SIM or a new unit before stock and engineer time run out.

Schedule Number Porting

Porting a single line needs around ten working days; multi-channel circuits take longer. BT Wholesale already asks resellers to reserve diary space early so late movers are not left without an inbound line. Send your Letter of Authority, pick a go-live window that avoids peak trading, and lock your slot while capacity is wide open.

Setup your Phone System

To set up the phone system, first ensure that the number port is booked in. Next, configure the welcome messages and set up call groups to efficiently manage incoming calls. Then, establish voicemail settings and install the necessary phones and apps. Once everything is in place, thoroughly test the phone system to confirm functionality. After completing these steps, the digital VoIP phone system will be ready for use.

Why BT Pushed the Final Date to 2027?

BT originally planned to shut the Public Switched Telephone Network in December 2025, yet on 21 May 2024 it shifted the cut-off to 31 January 2027. Tests and real-world cases showed many analogue telecare alarms and safety devices failed during early migrations, so extra time was needed to make the change safe for every user.


New measures—free battery packs, clearer labelling, road-show support and an industry code—must now be in place before forced moves resume, giving vulnerable customers confidence while letting firms plan around the BT landline switchover 2027 deadline.

Pause for Vulnerable Users Explained

About two million people depend on pendant alarms, medical monitors and other devices that call for help over copper lines. Early roll-outs cut some of these lifelines, prompting BT and regulators to halt mass switching until fixes were proven.


Under the new code, anyone flagged as vulnerable is moved only after their equipment is tested, a battery back-up is fitted and a carer contact is logged. A June 2025 campaign urges users to register special needs, and engineers now carry out in-home checks before porting numbers

Pause for Vulnerable User Explained

New Rollout Timetable by Region

BT restarted its customer-led programme in 2024 and gives at least four weeks’ notice before each switch:

  • Autumn 2024: Northern Ireland, London
  • Winter 2024: East Anglia, East Midlands
  • Spring 2025: Yorkshire & Humber, North East, Scotland
  • Summer 2025: North West, Wales, further Scottish exchanges
  • Autumn 2025: West Midlands, South West
  • Winter 2025: South East

Pilot areas Salisbury and Mildenhall are already digital, and the South West is slated to be the last large region before a single national

“switch day” on 31 January 2027.

FAQs

Answers to some of our most commonly asked BT Landline Switchover 2027 questions…

  • Is BT switching off landlines completely?

    Analogue copper lines will stop working by January 2027. Phone calls will instead travel over broadband through BT’s Digital Voice or any VoIP service. You still dial and answer with a normal handset; only the network behind it changes.

  • Will my landline still ring after January 2027?

    It will ring only if the service has moved to a digital platform before the cut-off. Households and firms that switch to the Digital Voice service or another VoIP line keep normal ringing and caller ID. Staying on copper after the deadline means silence.

  • What happens if I stay on analogue past the deadline?

    PSTN numbers left on copper will be ceased by the supplier. Alarm systems, card machines, lifts and fax devices linked to that line will fail. Restoring service then takes a fresh order, extra cost and added wait.

  • Can I keep my phone number when I change to Digital Voice?

    Yes, your existing number can be ported to any digital provider. Submit a port request before cancelling the old line to avoid loss. The process is regulated, and most transfers finish within one to ten working days.

  • Do I need new handsets for BT Digital Voice?

    Many modern cordless or corded phones work when plugged into the router with an adapter. BT also offers handsets that include Digital Voice support for extra features. Very old pulse-dial models may need replacing.

  • How do power cuts affect Digital Voice phones?

    Digital Voice needs mains power for the router, so a blackout stops calls. Ofcom rules say vulnerable users must have at least one hour of backup, usually a battery pack. Businesses can add an uninterruptible power supply to keep phones online during outages.

  • What is the cheapest way for a small firm to meet the deadline?

    Moving to a cloud VoIP plan that uses existing fibre broadband is the lowest-cost path. Choose a provider that ports numbers free and supplies adapters so present phones can stay. Bundling calls and lines in one package often cuts monthly bills by about 30 %.